Skip to content

The work we do, in timelapses.

Wall skimming and base-coating, window installation, floors, plasterboard, tiling and bathrooms: these are the trades we carry out with our own crew, without subcontracting the bulk of the work. For each one we publish a timelapse filmed with a fixed camera on a real project, start to finish. A timelapse cannot be dressed up with editing: either the work is done right, or it shows.

The trade

Wall base-coating and skimming

The base coat is the layer of render that straightens a wall: it goes over the brick or the old finish and is screeded until the surface is flat. On top goes the fine skim, which is what gets painted. If this step is done badly, no paint will hide it: the ripples show every evening, when the light comes in sideways.

  • Whatever is unsound comes off: paper, hollow textured coating or loose finishes
  • Perlite render applied by hand and screeded until the wall is flat
  • Fine finishing skim, ready for primer and paint
Filmed on our Tarifa project · fixed camera, no cuts, no audio

The trade

Window installation

Replacing a window properly takes about a day per opening: removing the old one without damaging the wall, offering in the new frame, levelling and plumbing it, fixing it and sealing the whole perimeter. The sealing is what keeps out water, noise and draughts — it is what separates a well-fitted window from one that whistles all winter.

  • Old frame removed without damaging the opening
  • New frame levelled, plumbed and fixed to the structure
  • Perimeter sealed with mortar outside and finished inside
Filmed on our Tarifa project · fixed camera, no cuts, no audio

The trade

Floor installation

We fit laminate, vinyl and ceramic flooring, and what decides the result is not the plank: it is the base. A new floor over an unlevelled screed creaks, rocks and opens up at the joints within months. So the first job is checking the surface and levelling where needed; with the base done right, laying the floor is the quick part.

  • Base checked and levelled where needed
  • Laid with the expansion joints each material requires
  • Skirting and finishing at doors and transitions

The timelapse for this trade is being filmed on site. We will publish it here as soon as we have it.

The trade

Plasterboard ceilings and walls

Plasterboard handles false ceilings, wall linings and new partitions quickly and without rubble. In renovations we use it above all for ceilings that carry the wiring and plumbing without chasing the slab, and to divide rooms — it is how we split a bedroom in two on the Tarifa project.

  • Metal framing levelled and fixed
  • Boards cut and screwed, with access panels where needed
  • Joints taped and filled, ready for paint
Filmed on our Tarifa project · fixed camera, no cuts, no audio

The trade

Tiling and bathrooms

Bathroom tiling is decided by what you never see: the waterproofing of the shower area and the setting-out of the tiles before the first one is cut. Good setting-out avoids narrow slivers in the corners and visible cuts; good waterproofing avoids the damp patch that shows up on the neighbour's ceiling a year later.

  • Shower and wet areas waterproofed
  • Full setting-out before the first tile is cut
  • Walls and floor tiled, with joints grouted and clean

The timelapse for this trade is being filmed on site. We will publish it here as soon as we have it.

These timelapses come from the same projects we film day by day. If you want the full context — what was decided, in what order and at what pace — it is in the site diary.

See the site diary

Free visit and quote

Tell us what you want to renovate.

Message us on WhatsApp with the area, what you want to do and when. We reply within minutes between 9am and 8pm and propose a day for the visit.